ENERGY AUDIT
RESIDENTIAL
TELECOM
INDUSTRIAL
COMMERCIAL
SOLAR POWER
ENERGY AUDIT

ENERGY AUDIT

We uncover what your energy bill is hiding. A comprehensive floor audit that delivers real savings — fast.

Energy Audit — Yoshinova

Your floor is bleeding money. We find exactly where.

Most facilities lose 10–25% of their energy to inefficiencies they can't see — poor power factor, oversized motors at partial load, phantom draws, and reactive penalties silently inflating the bill. Our audit gives you a precise, data-backed map of every leak. Before you invest in any solution — BESS, solar, retrofit — you know exactly what it will save.

Typical bill cut

10–25%

post-audit, no capex needed

Logging window

7–30 d

class-A analysers

Time to first ₹ saved

~30 d

from audit kickoff

Sizing accuracy

±5%

vs. nameplate-based ±35%

Measure → Map → Quantify

STEP 1DEPLOY ANALYSERSTEP 2CAPTURE 30-DAY CURVESTEP 3ISOLATE LEAKSLIVE • PHASE A428 kWPF 0.78 • THD 6.4%MENUVIEW● RECPHASEABCL1 L2 L3 NPOWER ANALYSERkW (×100)02468avg loadSPIKE11:42 AMD-30D-15TODAY30-DAY LOAD CURVEInefficient motorsof total waste32%Poor power factorof total waste24%Idle equipment drawof total waste18%Reactive penaltiesof total waste14%IDENTIFIED LEAKSSTEP 4RANK SAVINGS BY ROI — QUICK FIXES FIRST, BESS LAST-4%Quick fixes-7%PF correction-10%Variable-speed drives-14%BESS deployment-3%BehaviouralCUMULATIVE-38%on monthly utility billaudited. quantified. guaranteed.indicative breakdown — your audit returns site-specific values

Why an audit first

An un-audited BESS purchase is a guess

The single largest reason BESS projects underperform in India is wrong sizing. Most installers quote based on connected load, sanctioned demand or nameplate ratings — which over-state real consumption by 25–40%. An audit first makes every rupee of subsequent capex defensible.

Typical waste in MSME bills

10–25%

Recoverable through audit + low-capex fixes alone.

BESS sizing accuracy

±5%

Audit-driven sizing vs. ±35% on nameplate-based.

Why now

BEE PAT-VIII (2025–28) makes audits compulsory.

Designated consumers under BEE's Perform-Achieve-Trade scheme must now log a third-party energy audit each cycle. Yoshinova's audit format is BEE-aligned — your audit doubles as compliance and as an action plan.

  • India's Energy Conservation (Amendment) Act, 2022 expanded mandatory audit coverage to mid-tier industries — most MSMEs don't know they're in scope.
  • PAT-VIII targets demand 1–4% energy intensity reduction over 3 years — un-audited facilities miss targets and pay through ESCert deficit.
  • Pre-BESS audits return their own cost in <60 days through low-capex fixes — long before any storage is deployed.

Live audit overlay

Where exactly your bill leaks.

Red is your raw metered draw. Green is what your floor actually needs. The gap — every hour — is wasted rupees we can recover.

0255075100kW00:0006:0012:0018:0024:00HOUR OF DAYMetered drawProductive loadLIVE

Recoverable waste

23%

of monthly kWh on this floor

Power factor

0.78

reactive penalty zone — fixable

ROI on audit

< 60 d

before any capex investment

Where audits land hardest

Audit-first across every vertical

We do not start with a product — we start with your meter. Here\'s where our audits typically uncover the biggest deltas, by sector.

Audit 01

MSME Manufacturing Units

Older motors, sub-optimal layouts, contracted-load drift. We find the 18–25% of bill that's leaking through equipment you've stopped looking at.

-22%

avg bill cut

Audit 02

Commercial Buildings

HVAC oversizing, lighting waste, lift cycling, idle UPS. We map every kVA and rank fixes by ROI — not by capex.

-18%

avg bill cut

Audit 03

Telecom & Data Sites

Cooling efficiency, rectifier losses, idle radios. We benchmark you against best-in-class fleets and show the gap.

PUE 1.4

achievable target

Audit 04

Pre-BESS Sizing Audit

Before you buy a kWh of storage — we measure 30 days of real load. The difference between guessed and audited sizing is usually 30–40%.

30 days

load logged

Audit 05

Power-quality Forensics

Tripping VFDs, cooked PCBs, mystery downtime. We chase harmonics, voltage sags, and earth leakage to root cause.

±0.5%

voltage tolerance

Audit 06

BEE / PAT Compliance

Designated consumers under BEE's Perform-Achieve-Trade scheme. We deliver compliance-ready audit reports and ESCert pathways.

BEE

accredited format

Process

From meter to a costed roadmap

01

On-Site Walkthrough

Our Chief Energy Advisor visits your facility — meter rooms, motors, panels, HVAC. No template — every site gets a fresh read by senior engineers.

02

Power-Quality Logging

Class-A power analysers logged for 7–30 days. We capture real load, harmonics, voltage events, peak demand profile and reactive draw across phases.

03

Loss Identification

We isolate every loss — motor inefficiency, transformer copper/iron, idle phantom load, reactive penalties — and quantify each one in ₹/month.

04

Optimisation Roadmap

You receive a prioritised, ROI-ranked action plan. Quick wins first, capex projects costed and timed. BESS sizing — if relevant — is data-driven, not guessed.

Audit on factory floor

Audit-first, always

Personally led by our Chief Energy Advisor — no juniors, no guesswork.

Get Started

Ready to stop the bleed?

Book a no-obligation energy audit and find out exactly how much your facility is leaving on the table.