
TELECOM
Reliable power for critical infrastructure. Keep your towers running with clean, silent energy storage that never fails.
Telecom BESS — NovaConnect
Replace diesel with silent, always-on power.
NovaConnect is purpose-built for telecom towers and critical network infrastructure requiring 99.9% uptime. Replace diesel generators with silent, instant-response battery storage. Zero warm-up time, zero emissions, zero fuel costs. Reduce operating expenses by 70% while ensuring your network stays online 24/7. Remote monitoring and automated failover keep your towers running without manual intervention.
Network uptime
99.9%
SLA-verified
OPEX vs DG
-70%
fuel + AMC + theft
Footprint
-60%
vs. lead-acid bank
Failover
< 20 ms
no warm-up
Tower Power Flow
Market Outlook — Telecom
The diesel-to-storage shift is no longer optional
Indian telecom towers consumed roughly 250 crore litres of diesel annually until 2024. With diesel near ₹95/L and 5G densification adding 30–40% load to existing sites, the OPEX math has flipped permanently in favour of lithium-ion BESS.
India telecom BESS by 2030
₹14,000 Cr
Tower-co fleets are the fastest-converting segment.
CAGR 2024–30
38%
Driven by 5G load, diesel cost and DOT green-tower mandates.
Why now
DoT mandate: 50% of towers green by 2027.
India's Department of Telecommunications has set firm targets — 50% of mobile towers running on renewable energy by 2027, 75% by 2030. Solar alone won't hit it; storage is the compulsory second leg.
- TRAI consultation papers (Mar 2025) explicitly call out lithium-ion BESS as the preferred replacement for VRLA + DG hybrids.
- Tower OPEX models show payback under 4 years across most rural sites — even faster where pilferage of diesel is a known cost.
- NovaConnect supports OCP / OpenBMS protocols — slots into existing tower-co NOCs without a forklift upgrade.
Tower OPEX vs. uptime
Diesel costs climb. Uptime stays at 99.9%.
Old hybrid: diesel runs hard during outages, OPEX climbs every grid event. NovaConnect: silent battery rides through, OPEX stays flat.
OPEX vs DG
-70%
fuel + AMC + theft
Uptime today
99.99%
across the active fleet
Diesel litres saved
12,450
cumulative this quarter
Sites we power
From metro macro to remote rural
Every tower has a different load, climate and grid story. NovaConnect is configured site-by-site — but managed fleet-wide from a single dashboard.
Site 01
Macro Sites — Urban
Dense city loads, frequent micro-cuts, no room for noisy DG. Replace the genset entirely with NovaConnect — silent, always on.
0 dB
noise emitted
Site 02
Greenfield Rural Towers
Long grid distances, weak feeders. Solar + NovaConnect runs 18+ hours daily on renewables, cutting diesel runs to seasonal-only.
-85%
diesel litres
Site 03
5G Densification Cells
Massive MIMO radios pull bursty kW. NovaConnect smooths spikes so the existing genset / grid isn't over-stressed.
+30%
load headroom
Site 04
Lithium-ion Replacement
Replace ageing VRLA banks 1:1 with NovaConnect — same footprint, 4× cycle life, half the weight, full IoT visibility.
4×
cycle life vs VRLA
Site 05
Fiber & Edge Datacentres
PoP rooms, edge MEC sites and central offices. Bridges the 60 sec UPS-to-DG gap with zero gap, 5–8× longer.
8 h
extended ride-through
Site 06
Tower Co. Fleets
Manage 1000s of sites with a single dashboard. Spot a failing battery before the SLA breach — predictive, not reactive.
fleet
managed in one view
Process
Site-by-site rollout, fleet-grade visibility
Site Survey & Load Profile
Site Survey & Load Profile
We collect 30 days of OPEX (diesel litres, AMC, downtime) and current battery health. Site-by-site or fleet-wide — both supported.
We collect 30 days of OPEX (diesel litres, AMC, downtime) and current battery health. Site-by-site or fleet-wide — both supported.
NovaConnect Configuration
NovaConnect Configuration
Each site gets a custom kWh / kW config. Outdoor cabinets are IP55, -10 °C to +55 °C rated. Solar-ready out of the box.
Each site gets a custom kWh / kW config. Outdoor cabinets are IP55, -10 °C to +55 °C rated. Solar-ready out of the box.
3–5 Day Site-Level Cutover
3–5 Day Site-Level Cutover
Existing rectifier interface preserved — no changes to BTS or DC distribution. Field crews trained; no ops disruption.
Existing rectifier interface preserved — no changes to BTS or DC distribution. Field crews trained; no ops disruption.
NOC Integration
NOC Integration
Native SNMP / TL1 / REST API integration with your NOC. Dashboards for SOC, alarm aging, MTTR — fed straight to your ops team.
Native SNMP / TL1 / REST API integration with your NOC. Dashboards for SOC, alarm aging, MTTR — fed straight to your ops team.

Mission-critical infrastructure
Silent power that keeps networks live, even when the grid isn't.
GET STARTED
Ensure Network Reliability
Schedule a free tower site assessment and discover how BESS can improve uptime while reducing costs.




