
INDUSTRIAL
Industrial-scale energy storage that cuts costs, improves power quality, and keeps production running without interruption.
Industrial BESS — NovaMax
Cut your contract demand without cutting production.
NovaMax is a high-capacity, industrial-grade Battery Energy Storage System engineered for manufacturing plants, processing facilities, and heavy industrial operations. Cut demand charges by up to 40%, eliminate diesel dependency, stabilize power quality for sensitive equipment, and ensure zero-downtime production. Built to handle the most demanding industrial loads with proven reliability and rapid ROI.
Peak shaving
-40%
vs. unmanaged factory load
Switchover
< 20 ms
PLC- and VFD-safe
Cycle life
6,000+
LFP chemistry
Footprint
-70%
vs. lead-acid bank
Live Power Flow
Market Outlook — India
Industrial BESS isn't optional anymore
Demand charges in industrial tariffs across Maharashtra, Gujarat and Tamil Nadu now exceed ₹450/kVA. Diesel hit ₹95/L. The economic case for behind-the-meter storage flipped in 2024 — and 2026 is the catch-up year.
India BESS by 2030
₹48,000 Cr
Industrial + C&I lead the segment, ahead of utility-scale.
CAGR 2024–30
46%
Driven by demand charges, peak tariffs and renewable mandates.
Why now
Time-of-Day tariffs are reshaping factory economics.
CERC mandates ToD pricing across all India C&I consumers ≥ 10 kW from Apr 2025. Off-peak charging and peak discharge can shift 30–50% of monthly energy spend — but only with deployed storage.
- Captive solar penetration grew 2.4× in MSME industrial belts (2022–25). BESS unlocks the unused evening/night fraction.
- BIS-IS 16270 / IEC 62619 certifications now mandatory — Yoshinova is compliant out of the box.
- PLI and MNRE incentives apply to integrated BESS+RE projects above 500 kWh capacity.
Live load profile
Peak shaving in real time
The grid pulls a sharp daytime spike. NovaMax discharges through the peak window, leaving only a flat, low-cost load on your meter.
Peak shaved
-40%
measured peak vs. unmanaged contract demand
Today's saving
₹14,280
across all three phases, across all shifts
Carbon offset
184 kg
CO₂e displaced from grid coal
Sectors we power
Industries running on NovaMax
Every floor is different. We've shipped industrial-grade BESS across heavy and light manufacturing — here's where the ROI lands fastest.
Sector 01
Steel & Metal Processing
Furnaces, rolling mills and electric arc loads need stable voltage. NovaMax flattens sharp current draws and protects sensitive control systems.
-38%
demand charge
Sector 02
Textiles & Garments
Continuous shifts and motor-heavy floors. Avoid line stops during DG switchover and run looms straight through grid dips.
0 sec
switchover gap
Sector 03
Food & Beverage
Cold storage, packaging and CIP cycles can't tolerate outages. BESS rides through brownouts and protects spoilage risk.
24/7
cold chain
Sector 04
Chemicals & Pharma
GMP-grade facilities demand clean, stable power. Eliminate harmonics and voltage spikes that compromise batch quality.
±0.5%
voltage stability
Sector 05
Plastics & Moulding
Injection cycles spike at start. Shave peak draw without oversizing your sanctioned load — keep contract demand low.
-42%
peak kVA
Sector 06
Auto Components
Tier-1 and Tier-2 suppliers facing OEM uptime SLAs. Pair BESS with rooftop solar to lower your green-supply ratio.
6 yr
avg payback
Process
From audit to live ROI in under 30 days
Floor-level Energy Audit
Floor-level Energy Audit
Our Chief Energy Advisor walks the plant — meter by meter. We pull 30-day load data, isolate motor inefficiencies, harmonics and contracted-demand exposure.
Our Chief Energy Advisor walks the plant — meter by meter. We pull 30-day load data, isolate motor inefficiencies, harmonics and contracted-demand exposure.
Right-Sized BESS Design
Right-Sized BESS Design
NovaMax modules are sized to your real load curve, not nameplate ratings. We engineer for the kVA you actually pull, not what you fear pulling.
NovaMax modules are sized to your real load curve, not nameplate ratings. We engineer for the kVA you actually pull, not what you fear pulling.
Commissioning in 5–7 Days
Commissioning in 5–7 Days
Pre-fabricated containers ship ready-to-connect. Switchgear cut-overs scheduled around your shifts — most lines never see the change.
Pre-fabricated containers ship ready-to-connect. Switchgear cut-overs scheduled around your shifts — most lines never see the change.
Live ROI Dashboard
Live ROI Dashboard
BMS + IoT push real-time SOC, kWh discharged, ₹ saved and CO₂e offset to your phone. Verify your payback as it accrues, not at year-end.
BMS + IoT push real-time SOC, kWh discharged, ₹ saved and CO₂e offset to your phone. Verify your payback as it accrues, not at year-end.

Built for India's industrial backbone
Engineered in Kundli. Proven on factory floors from Pune to Pithampur.
GET STARTED
Power Your Industrial Operations
Schedule a free facility energy assessment and discover how BESS can reduce costs and improve reliability.




